
195-12-21110 Booy,Outer .
Bulldozer pawn lam arm, "bulldozer arm" emaw "boom" tia hriat bawk hi key load-bearing component a ni a, chu chuan bulldozer taksa chu shovel leh soil looser te ang chi hnathawhna hmanrua nena inzawm tir a ni. A bulpui ber chu arm structure, hydraulic cylinder, connecting hinge points, leh reinforcing ribs te a ni. A hnathawh ber chu hydraulic drive hmanga hnathawhna hmanrua lifting, tilt leh flipping neih theihna tur a ni a, chu chuan earthwork pushing leh site leveling ang chi hnate a ti zo ang. Outer arm hian bending moments leh impact load lian tak tak a tuar a ngai a, chuvangin a tlangpuiin high-strength low-alloy steel (Q345B ang chi) nen welded a ni a, arm section hi a tam zawk chu box shaped emaw i-shaped to enhance rigidity a ni.
Outer arm-a hman dan tur scenario .
I duh ber plan thlang rawh.

Earthwork Engineering-a hnathawh dan bulpui ber .
Site Leveling: Shovel chu pawn lam arm kal tlanga lifting leh lowering control-in, a hmun zau tak, a hmun zau tak chu siamrem theih a ni (a dik takin ± 5cm a ni), chu chu building foundation leh airport runway sakna atan pawh a ni.
Earthwork Pushing: Outer arm chuan shovel chu lei leh sand chu low atanga high-a transfer turin a nawr a, pushing volume pakhat chu 8-15m 3 (model tonnage a zirin) a ni.
Backfilling of Foundation Pit: Articulated outer arm, shovel tilting function nena inzawm chuan lei chu dik takin foundation pit-ah a luah khat thei a, layer khat hnu layer khatin a compact thei bawk.

Hnathawh dan bik atana adaptive operations .
Mining stripping: pawn lam kut chuan lei a ti hlim a, a hmasa berah chuan ore layer chunglama lungpui khauh tak chu a tikehsawm hmasa a, chutah chuan stripped material chu waste dump-ah shovel hmangin a nawr a, open-pit coal mining leh metal mining atan a tha hle.
Wetland/Swamp Operations: Lightweight Outer Arm design leh wide track bulldozers (TSY220 ang chi) te chu ground pressure tihtlem nan (0.04-0.13mpa) leh hmanrua pil loh nan.
Infrastructure Engineering Assistance: High-Speed Railway leh Bridge Construction-ah chuan pawn lam kut chu roadbed foundation treatment, filling material paving, leh filling embankments horizontal-a kawngpui laihchhuahna atan hman a ni.

Extreme environment hnathawhna hmun zau zawk .
High altitude/high temperature environment: Outer arm hydraulic system hian temperature resistant low/high resistant seals (- 40℃to{{1}℃) a hmang a, chu chu high-altitude bulldozer (Tyg220 type ang chi) tan a tha hle.
Environmental sanitation/emergency operations: Pawn lam arm hmalam tawp chu attachment hmanga thlak theih a ni a, chu chu grab buckets leh breaking hammers te chu post disaster cleaning leh construction waste transportation atan a ni.

Homework angle leh range siam that .
Bulldozer thenkhat pawn lam arm hi lateral swing function (tilt cylinder nena inzawm) hmanga design a ni a, chu chuan shovel chu veilam leh dinglam tilt turin a khalh thei a, slope pushing emaw single-sided unloading mamawh ang zelin a insiamrem thei a Outer arm tihzauh emaw, rotate emaw hmangin (model tlemte tan) operating radius chu tihzauh theih a ni a, operational flexibility pawh a tha zawk thei bawk.
hot tags .: 195-12-21110 Booy,Outer, China 195-12-21110 Booy,Outer siamtu, Supplier, Factory
Inquiry thawn rawh .







